Daniels Training Services

generator improvements rule

FAQ: Which regulations of the Generator Improvements Rule are more strict than existing USEPA regulations?

FAQ: Which regulations of the Generator Improvements Rule are more strict than existing USEPA regulations?

The Generator Improvements Rule went into affect at the Federal level and in states lacking an authorized hazardous waste program on May 30, 2017.  The new rule contained approximately 60 changes to existing RCRA regulations.  Some of the changes were…

Everything About the Generator Improvements Rule

Everything About the Generator Improvements Rule

This article will serve as a single location for information related to the Generator Improvements Rule.  Articles providing more information are available through the links below. Daniels Training Services, Inc. 815.821.1550 Info@DanielsTraining.com http://www.danielstraining.com/ General information and background: Summary of Proposed…

The Fifty Foot Rule Revised by the Generator Improvements Rule

The Fifty Foot Rule Revised by the Generator Improvements Rule

The Generator Improvements Rule went into effect on May 30, 2017.  “Into effect” however, only in the federal regulations of the U.S. Environmental Protection Agency (USEPA) and those states without an authorized hazardous waste program (read:  What is the status…

Status of Generator Improvements Rule in Michigan

Status of Generator Improvements Rule in Michigan

The below is taken verbatim from the Michigan DEQ website. Contact: Ronda Blayer 517-284-6555 Agency: Environmental Quality On November 28, 2016, the final Generator Improvements Rule was published in 81 Federal Register 85732. These regulatory revisions were promulgated under the…

Episodic Generation of Hazardous Waste for a Very Small Quantity Generator Under the Generator Improvements Rule

Episodic Generation of Hazardous Waste for a Very Small Quantity Generator Under the Generator Improvements Rule

The Generator Improvements Rule includes over sixty (60) changes to the regulations of the U.S. Environmental Protection Agency (EPA) applicable to generators of hazardous waste.  The regulations created by the Generator Improvements Rule went into effect on May 30, 2017…

FAQ:  What is the Status of the Generator Improvements Rule in my State?

FAQ: What is the Status of the Generator Improvements Rule in my State?

The new USEPA regulations of the Generator Improvements Rule became effective on May 30, 2017 at the Federal level and in those states that lack an authorized hazardous waste program: Alaska Iowa The Indian Nations The territories Puerto Rico, American…