point of generation

The Hazardous Waste Determination for a Waste that Changes from Non-Hazardous to Hazardous

A generator of any solid waste is required to complete a hazardous waste determination according to the procedure at 40 CFR 262.11.  This determination is typically made at the point of generation, ie., at the moment the solid waste is…